Successful Delivery of 1MW/2.05MWh Energy Storage System at Nigeria State House Clinic — EITAI and GBL Take Partnership to New Heights!
Recently, EITAI, in collaboration with its local Nigerian partner Granite Builders Ltd (GBL), successfully completed and commissioned a major energy project — a 1MW/2.05MWh high-voltage energy storage system at the State House Clinic in Abuja, Nigeria. The system is now fully integrated into the hospital’s power supply, providing stable, round-the-clock electricity and effectively addressing the chronic power instability issues.

Project Overview

Project Duration: From project start to commissioning in just over 5 months
Outcome: Achieved 24/7 uninterrupted power supply for critical hospital equipment
Professional Team, Full Project Support
The entire project was executed by GBL, with their technical lead Mr. Wisam personally overseeing and coordinating planning, implementation, and on-site operations. From power room design and construction to equipment integration and system commissioning, the GBL team demonstrated high professionalism and execution capacity.
The core design of the energy storage system was completed by EITAI Honorary Engineer Mr. Charbel Chkeir. To ensure compatibility between new and existing systems, Charbel customized rack structures and system topology according to site and electrical requirements, ensuring efficient installation and future maintenance.

Technical Highlights
All battery modules are EITAI’s independently developed high-voltage 14.3kWh 280Ah lithium batteries, featuring:
- High energy density.
- High rate performance.
- Long cycle life.
- International certifications (UN38.3, IEC, UL, etc.).
- Flexible system design with grid-tied and off-grid switching capability, meeting high-safety hospital power needs.
- Modular system design for easy expansion and maintenance.

Recognition and Outlook
After project completion, EITAI’s General Manager Mr. Chris and Project Lead William visited the site for inspection and highly praised GBL’s outstanding execution. This cooperation marks not only the deep trust between EITAI and GBL but also a significant milestone in jointly advancing renewable energy deployment in Africa.

Model of Sustainable Development
As Nigeria’s premier medical institution, the State House Clinic demands the highest standards of power security. The successful completion of this project not only enhanced the hospital’s power stability and safety but also serves as a valuable reference for other public facilities and energy projects in Nigeria.
EITAI will continue working with GBL to provide reliable clean energy solutions across Africa, advancing green development goals.
Contact Us for More Information.
If you have similar project needs, please contact us for detailed technical proposals, system architecture diagrams, and field operation feedback videos. We offer one-stop energy storage solution support.